Completion of photovoltaic installation works in Collbató

Photovoltaic installation, Collbató Most Enginyers has designed and directed a 3.2 kW photovoltaic solar installation in a single-family house in Collbató. This will generate arround 5,000 kW /year, equivalent to the state of 1,680 kg of CO2 emissions. The power is achieved thanks to eight solar panels of 400 W each. The support structure is made of aluminum and it […]

Calculation of stirrups, Tarragona

Previous Next Stirrups calculation in TV-3223 road The department of engineering of the terrain and structures of Most Enginyers realized the structural calculation of stirrups micropiled by the extension of the work of factory in the kilometric points 0 +885 and 3 + 600 of the TV-3223 road, Barranc del Pas, Tarragona. Details Date 12/2019 Location Tarragona Activity Stirrups calculation

Walkway, Sant Andreu de la Barca

Previous Next Walkway modification project The structural engineering department of Most Enginyers, with experience in the design and execution of walkways, carried out the modified project of a pedestrian walkway in Sant Andreu de la Barca. Details Date 02/2019 Location Sant Andreu de la Barca Activity Modified project

Floodable ford, Molí Fariner

Previous Next Floodable ford, Molí Fariner The team of the department of structures of Most Enginyers has carried out the project of a floodable ford that crosses the river Anoia in its passage through Martorell, at the height of the flour mill. Details Date 07/2016 Location Martorell Activity Walkway project

Floodable ford, Can Carreras

Previous Next Floodable ford, Can Carreras The team of the structure department of Most Enginyers has carried out the project of a floodable ford that crosses the river Anoia in its passage through Martorell, at the height of Can Carreras. Details Date 11/2016 Location Martorell Activity Walkway project

Floodable ford, Badia del Vallès

Previous Next Floodable walkway The team of the structures department of Most Enginyers has carried out the project of a floodable ford, for the bike path that connects Badia del Vallès and the Universitat Autònoma de Barcelona. It does not directly cross any river, but could receive indirect floodings from the Sec River during heavy rainy seasons. Details Date 03/2016 Location Badia […]

N-230b Viaduct, Xerta

Previous Next Viaduct project, Xerta The team from the structures department of Most Enginyers calculated the 100-meter viaduct bridge over the Xalamera ravine on the N-230b, from Horta de Sant Joan to Xerta. Details Date 07/2008 Location Xerta Activity Bridge project

Sewage system survey, Sant Fruitós de Bages

Sewage system survey in Sant Fruitós The Most Enginyers soil engineering department has been asked for their technical opinion on the project and execution of the sewer improvement work on Avinguda Girona in the municipality of Sant Fruitós del Bages, as well as the successive actions that have taken place in the same area, in order to give technical arguments […]