Structural Design for the Basic Urbanisation Works Project of the Parc de l’Alba Sector within the Master Plan for the Centre Direccional of Cerdanyola del Vallès

The structures designed as part of the project are the following:

Channelling works for the Torrent de Magrans.

V-B.2: Bridge over the Torrent de Magrans on Axis B.

V-7.1: Bridge over the Torrent de Magrans on Axis 7.

V-E.1: Bridge over the Torrent de Magrans on Axis E (outside the PDU scope).

V-F.1: Bridge over the Torrent de Magrans on Axis F.

V-G.1: Bridge over the Torrent de Magrans on Axis G.

Riera de Sant Cugat Viaduct: viaduct replacing the existing one at the access to SACESA’s industrial units.

M-EP7b: Retaining wall supporting the EP7b pedestrian path.

M-EP.6: Retaining wall adjoining the Parc de Magrans green area on Axis EP6.

ADIF cut-and-cover tunnel – west: extension of the existing cut-and-cover tunnel.

Sant Marçal OD.

Details

Year 2021
Location Cerdanyola del Vallès
Service Preparation of the structural appendix and drawings for a basic urbanisation works project