Skip to content
About us
Press room
Our team
Work with us
Engineering
Water Engineering
Soil Engineering
Structural Engineering
Industrial Engineering
Bridges and walkways
Urbanisation and roads
Renewable Energies​
Environment and Territory
Architecture
Tenders
BIM
Software
LENA
RODAVIA
EN
ES
CAT
FR
PT
Non-affectation study, TMB L9
The field engineering team of
Most Enginyers
has carried out the non-affectation study in the tunnel of line 9 of Barcelona's metro as it passes through the Prat de Llobregat, due to the construction of a building .
Details
Date
03/2017
Location
Prat del Llobregat
Activity
Non-affectation study