Skip to content
About us
Press room
Our team
Work with us
Engineering
Water Engineering
Soil Engineering
Structural Engineering
Industrial Engineering
Bridges and walkways
Urbanisation and roads
Renewable Energies​
Environment and Territory
Architecture
Tenders
BIM
Software
LENA
RODAVIA
EN
ES
CAT
FR
PT
Previous
Next
WWTP restructuring project
The team of the hydraulic engineering department of
Most Enginyers
has carried out the construction project to remodel the Wastewater Treatment Plant and the upstream collectors of Caseres d'Artesa de Lleida.
Details
Date
11/2018
Location
Artesa de Lleida
Activity
WWTP