Sewage system survey, Sant Fruitós de Bages

Sewage system survey in Sant Fruitós The Most Enginyers soil engineering department has been asked for their technical opinion on the project and execution of the sewer improvement work on Avinguda Girona in the municipality of Sant Fruitós del Bages, as well as the successive actions that have taken place in the same area, in order to give technical arguments […]

Slope stability Study, Murcia

Geotechnical study for slopes, Murcia The soil engineering team of Most Enginyers has carried out the geological study and the calculation of slope stability for the execution of a walkway in El Palmar, Murcia. Details Date 04/2018 Location El Palmar, Múrcia Activity Geotechnical study

Non-affectation study, Ronda’s Tunnels

Non-affectation study, Ronda de Dalt The field engineering team of Most Enginyers has carried out the study of non-affectation in the tunnels of La Ronda de Dalt due to the construction of a residential building on Via Augusta in Barcelona. Details Date 10/2018 Location Barcelona Activity Study of non-affectation

Non-affectation study, TMB L9

Non-affectation study, TMB L9 The field engineering team of Most Enginyers has carried out the non-affectation study in the tunnel of line 9 of Barcelona’s metro as it passes through the Prat de Llobregat, due to the construction of a building . Details Date 03/2017 Location Prat del Llobregat Activity Non-affectation study