Skip to content
About us
Press room
Our team
Engineering
Water Engineering
Soil Engineering
Structural Engineering
Industrial Engineering
Bridges and walkways
Urbanisation and roads
Architecture
Tenders
BIM
Software
LENA
RODAVIA
EN
ES
CAT
FR
PT
Non-affectation study, TMB L9
The field engineering team of
Most Enginyers
has carried out the non-affectation study in the tunnel of line 9 of Barcelona's metro as it passes through the Prat de Llobregat, due to the construction of a building .
Details
Date
03/2017
Location
Prat del Llobregat
Activity
Non-affectation study